Shanxi Meijin Chemical Project – Volume-Saving Soft-Start

Shanxi Meijin Chemical Project – Volume-Saving Soft-Start

Project Characteristics

The initial phase employed our company’s 10kV, 16000kVA variable frequency soft starter for motor start-up. Subsequently, due to specific on-site requirements, a single-drive-two-motor modification was implemented, simultaneously enabling start-up of both 19400kW and 14000kW motors.

On-site Load Conditions

10kV 14,000kW Centrifugal Compressor (Gas Compressor) – 1 unit;
10kV 19,400kW Centrifugal Compressor (Gas Compressor) – 1 unit.

Related Cases

Byrainy

Petrochemical Flue Gas Turbine Energy Recovery Project – High-Voltage Soft Starter

Petrochemical Flue Gas Turbine Energy Recovery Project – High-Voltage Soft Starter

Project Characteristics

This project involves the main fan system of the energy recovery unit for flue gas turbines at Yueyang Changling Petrochemical. Featuring high-power motors, it imposes stringent requirements on starting current and the performance of solid-state soft starters. The system employs advanced control algorithms to precisely regulate motor rated voltage and current. By incrementally increasing voltage and current, the motor accelerates gradually, thereby reducing starting current and time. This alleviates the burden on both the motor and the grid, achieving smooth motor start-up. The high-voltage soft starter offers advantages including low starting current, short starting time, compact size, low power consumption, high reliability, high sensitivity, maintenance-free operation, and straightforward installation.

On-site Load Conditions

10kV 23000kW axial flow compressor.

Related Cases

Byrainy

Oil Drilling Platform – High-Voltage Soft Starter

Oil Drilling Platform – High-Voltage Soft Starter

Project Characteristics

Offshore drilling platforms operate within marine environments characterised by high humidity, significant temperature fluctuations, strong winds, and salt spray corrosion. The high-voltage soft starter equipment maintains stable operation under these harsh conditions, delivering superior performance. This provides critical support for ensuring the normal operation and safety of the drilling platform.

On-site Load Conditions

6.3kV 2240kW Compressor

Related Cases

Byrainy

Annual 250,000-tonne Lysine Project – High-Voltage Soft Starter

Annual 250,000-tonne Lysine Project – High-Voltage Soft Starter

Project Characteristics

Specialised Load: Steam turbine generator. Process involves utilising the turbine to drive the generator to 95% of rated speed, followed by flywheel start-up via the soft starter to achieve full rated speed. Upon reaching rated speed, the soft starter disengages from the main circuit, enabling the generator to reverse power and synchronise with the grid.

On-site Load Conditions

10kV 12,000kW steam turbine generator set × 1;

Related Cases

ByFred

Hello world!

Welcome to WordPress. This is your first post. Edit or delete it, then start writing!

Seraphinite AcceleratorOptimized by Seraphinite Accelerator
Turns on site high speed to be attractive for people and search engines.